Prashant V.

Qa Engineer

435 dollar

Mon expérience

Voir plus

Teva Actavis Co. Ltd.March 2020 - Présent

Project Description Quality check for more than 20 Multilingual Live
Pharma site with continues New Feature Developments and existing Design &
Feature Enhancements.

Responsibilities:
Main
assignment in this project involves,

Ø

mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Following SDLC in each
Sprint for developing products/features well as UI improvements.

ØParticipating in Sprint
Kick-off meeting with Stakeholders (i.e. Product
Owners and Business Analysts) to understand the flow of Application & gaps
and also providing possibilities of the changes.

ØPreparing & producing Test Strategy and Test Plan to
cover maximum test coverage with optimum efforts.

ØUnderstanding BRDs and
Analysing FSD for both Backend/Frontend Services and New Feature Development
related other documentations listed in Confluence.

ØProviding Story Points for every features in each sprint.

ØPreparing Requirement
Traceability Matrix and validating new services related features testing
status.

ØInitiating Scrum Daily Meeting and conducting regular discussion
with testing team.

ØPerforming Task dispersal and supervision within the
testing team.

ØPreparing test input data and
configuring specialized test environments for end-to-end testing of developed
services.

ØParticipation in Planning,
Writing and Execution of Functional Test Cases manually in Jira.

ØRaising risks, concerns & impediments and recommending
potential resolutions to the team.

ØParticipation in Design Discussions with RubyLibre Designers
from NL & other stakeholders and analysing the possible impacts in the application
flow.

ØWalkthrough Manual Test Cases written by QA Team and
providing feedback.

ØParticipation in cross browser Testing and Responsive
Testing.

ØTesting and reporting defects and conducting Triage
Meetings for reported defects with Scrum Team and update Priority/Severity.

ØParticipate in discussion with Developers for reported defects
for walkthrough to reproduce, if required.

ØParticipation in Feature
Sanity & Regression on INT, PreProd, STAGE before new features Go LIVE.

Voir plus

Safe Charge Ltd.March 2018 - Présent

Project Description Quality check for more than 10 Online Payment
Plugins and Alternate Payment Method’s Gateways in different regional
international languages.



Responsibilities:
Main
assignment in this project involves,

ØAnalysing software requirement
specifications in Safe Charge’s Developer Requirements and Feature Development
related other documentations listed in WIKI.

ØPreparing formal Test Plans
and validating new payment system’s features.

ØPreparing complex input data
and configuring specialized test environments for end-to-end payment plugin’s
testing.

ØPreparing Requirement
Traceability Matrix and validating new services related features testing
status.

ØInvolved in Planning, Writing
and Execution of Test Cases in Azure DevOps TFS manually.

ØOptimizing deployed 3DS_v2
security features in Credit Card Payment processing.

ØPerforming E2E Payment Plugin
Implementation Testing on eMerchant platforms for WooCommerce (v3.7.0),
OpenCart (v3.0.3.1 & v2.3.0.2), PrestaShop (v1.7.6.1) and Magento (v2.3.2).

ØWriting SQL scripts on
HeidiSQL and Verifying test results from SQL Database.



Ø
mso-bidi-language:TH">Participation in cross browser Testing and Responsive
Testing.



Ø
mso-bidi-language:TH">Testing and reporting defects and conducting Triage
Meetings for reported defects with Scrum Team and update Priority/Severity.

ØUtilizing TFS to
document/track defects and generate project status report.

ØConducting product design
reviews throughout SDLC and providing input on functional requirements as well
as UI improvements.

ØInvolved in updating & executing
automated regression test scripts in IntelliJ BDD framework using
Cucumber-Gherkin.

ØInvolved in maintaining
RESTful API Test Suites by writing and executing JSON scripts in Postman.

ØInvolved in Deploying Builds
on QA Environment by using GIT-Lab after fixes provided from the DEV team.



Ø
mso-bidi-language:TH">Actively participate in Sprint Review and Retrospective
meetings.

Voir plus

AIM Specialty Health (Anthem Inc.)December 2018 - February 2019

Project Description:  Quality checks for AIM’s Health Care Portal
Backend Services.

Responsibilities:
Main
assignment in this project involves,

ØWorked on multiple
cross-platform applications testing for top American Health Insurance company’s
web-portal back-end services such as Client, Members, Clinical Services,
Service Providers, and Customer Communications etc.

ØAnalysing software requirement
specifications in AIM’s Interface Agreement (IA) docs and other documentations
listed in WIKI.

ØManually testing and verifying
backend services in AIM’s Swagger platform.

ØManually testing and verifying
Messaging Services between BE Application Server & FE Customer Node on
Rabbit MQ.

ØInvolved in Planning, Writing
and Execution of Test Cases in JIRA.

ØReporting Bugs according to
severity and priority in JIRA.

ØInvolved in maintaining &
executing automated regression test scripts in IntelliJ BDD framework using
TestNG.

ØInvolved in maintaining RESTful
API Test Suites by writing and executing JSON scripts in Postman.

ØInvolved in preparation of Test
Execution Reports for submission based upon Postman Test Suites.

ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

ØInvolved in Deploying Builds
on QA Environment by using GIT-Lab after fixes provided from the off-shore DEV
team.

ØInvolved in Test Practice
Assessment sessions with on-shore US team in our Daily QA Sync-Up Meetings.

ØInvolved in Sprint Planning
sessions with BAs and PO from on-shore US team at the beginning of each Sprint.

ØInvolved in Best Practice
Assessment & Corrective Measurements sessions with on-shore US team in our
Retrospective Meeting after each Sprint of 2 weeks.

ØInvolved in discussion with functional
test team to ensure 100% test execution at the end of each test cycle and zero
bug regression backlog before service-batch release in Production.

Voir plus

Sr. Software QA Engineer (Active QA Lead)February 2016 - November 2018

Project DescriptionQuality Control for more than 15 Online
Trading Websites currently for different regional international languages.



Responsibilities:
Main
assignment in this project involves,



ØInvolved in Planning, Writing
and Execution of Test Cases in JIRA.



ØInvolved in Reporting Defects
according to severity and priority.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.



ØInvolved in Deploying Builds
on Staging & Production environment by using GIT & BitBucket after
fixes provided from the DEV team.



ØChecking codes provided by DEV
before uploading to STAGE for Testing in QA Environment followed by pushing the
commits into PROD, including Sanity & Regression Test again.



ØAPI Key Request Response
testing by using POSTMAN.



ØManaging & Analysing Client-Side
Data verification stored though Live Frontend Trading Website in MS Dynamic CRM
and internal Cheetah CRM.



ØInvolved in Communication with
CS, Compliance, MS and all other departments in the company related to Forex
Trading Accounts created on Live Forex Websites.



ØInvolved in Functional Testing
of different Payment Methods i.e CC, BWT, NETELLER, SKRILL, eVouchers and
eWallets.



ØLed functional test team to
ensure 100% test execution at the end of each test cycle and zero bug
regression backlog before website launch in Production.

Voir plus

Celcom KV SWAP Nominal Plan Project, Kuala Lumpur-MalaysiaMay 2016 - November 2016

Project Description:  Project Requirements were to Optimize Cluster
Level GSM/UMTS/LTE KPIs after SWAP done on 2G/3G sites with HUAWEI PENTA/QUAD
Band Antenna Model.

Responsibilities:
Main
assignment in this project involves,

ØPrepare new Site Engineering
Database based on NSN & Ericsson Site Engineering data in MS-Access/Excel.

ØCreate Neighbour List for New
Site added in the Network and running the script in live network by M2000 tool.

ØCo-ordinating Weekly &
Monthly Meetings on DPR with Circle Leaders and Customer interface.

ØRe-check old Freq. data and
plan new set of 2G-3G Freq. for GSM-900/1800, U900, U2100 (F1/F2) with help of
U-Net Planning tool & MCOM.

ØTilt Optimization based on Telenor
Tilt Rules and KPI Monitoring during SWAP & Reforming (i.e. HO_HSR,
TCH_Congestion, CDR, TRAFFIC_Imbalance, NE_Utilization etc.

ØAlso supporting Customer
Complaints Maintenance Team to resolve the issue related to Coverage and
Quality by Radio Analysis on Atoll Planning Tool.

ØSuccessfully completed
Swap/Migration of 3000+ Celcom Sites in First Phase of Swap Project till
Q3-2016 in all major cities of Malaysia with Customer Acceptance on the same.

ØEnd-to-end involvement in
Designing and Implementation on fields for Successful SWAP/Migration of other
Vendor Sites to Huawei System for Celcom-Malaysia.

ØValidation Pre & Post SWAP
KPI Dashboard check with validation of cause of any degradation marked to
Customer.

























ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

ØHandling optimization of new sites and handled problems
like RAB Speech drop, interference, IRAT handover failure, handover reversion,
in-building problem, antenna tilting, competitive Drive Test. By adding and
deleting Neighbours for reduce Pilot Pollution, interference, addition of
missing Neighbours & SC changes in order to enhance main routes
performance.



ØPrepare new Site Engineering
Database based for NSN & Ericsson Legacy database.

Voir plus

Telenor Parivartan-India AMS Project SupportOctober 2015 - April 2016

Project Description:  Project Requirements were to Optimize Cluster
Level GSM/UMTS KPIs after SWAP done on 2G site.



Responsibilities:
Main
assignment in this project involves,



ØNOC Team Activity Management
and IP-Network Call Tracing between BTS-BSC-MSC System of telecom network.



ØSuccessfully completed
Swap/Migration of 5000 Telenor Sites in First Phase of Swap Project till
Q4-2015 in all 6 circles in India with Customer Acceptance on the same.



ØSuccessfully completed
Swap/Migration of 1000 Telenor Sites in Second Phase of Swap Project till
Q1-2016 in all 6 circles in India with Customer Acceptance on the same.



ØMonitoring Team Movement of 6
teams for Pre-SWAP Drive Test Activities of SWAP sites for setting 2G KPI Level
for Post Drive Comparison.



ØValidation Pre & Post SWAP
KPI Dashboard check with validation of cause of any degradation marked to
Customer.



ØSupport to Pre-Sales Teams for
Submitting Network Solution Presentation to the Customer based on System and
Feature based Network Performance Enhancement.



ØIBCA-II GSM Feature enabling
followed by each KPI trending compilation for Customer Review.



ØFull responsible for any KPI
degradation of GUJ Circle along with RF Central Lead role for following up the
same for other circles too from RF end.



ØHygiene Check for all On-air
New Sites and Swapped sites followed with Level-2 Troubleshooting for any KPI
degradation.



ØResponsible for Network
Frequency Planning on U-Net_3.9 and Neighbour Planning from NASTER for GUJ
Circle.



ØPrepare new Site Engineering
Database based for NSN & Ericsson Legacy database and Parameter/NBR Audit.

Voir plus

Celcom PLO Project, Kuala Lumpur-MalaysiaApril 2015 - September 2015

Project Description:  Project Requirements were to Optimize Cluster
Level KPIs & KQIs for 7 RNCs of Southern & Eastern zone.



Responsibilities:
Main
assignment in this project involves,



ØDaily KPI & KQI Parameter
Monitoring for 7 RNCs and rectification’s implementations in Live N/W as per
requirements.



ØWorst Cell finding and
analysing the route cause for KPI Degradation with Optimization
recommendations.



ØCo-ordinating Weekly &
Monthly Meetings on DPR with Circle Leaders and Customer interface.



ØRe-check old Freq data and
plan new set of 3G Freq for U900, U2100 (F1/F2/F3) with help of U-Net_3.9
Planning tool & MCOM (PSC Retune Script implementation in LIVE N/W followed
with performance Analysis).



Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Worked on Bandwidth Throttling for optimizing the extensive use of the allocated band.

ØOptimization recommendations
as per guidelines (i.e. CS/PS CSSR & DCR, HO_HSR, TCH Congestion, TRAFFIC
Imbalance, NE Utilization, Alarms etc.

Ø
Traffic Analysis on
MapInfo_12.5, Interference Analysis, Capacity Analysis for different areas in
NASTER along with Geo-Location Report presentation to the Customer.

ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

Ø
3G-CS/PS Drive check, Analysis
of drive test data, identify weak coverage/quality areas, call related issues
(CS/PS setup time, Pilot pollution, interference Ec/Io, missing neighbour, call
drops, RAB establishment issues, less throughput), rectification of the same.

Voir plus

Globul-Telenor Network SWAP ProjectJune 2014 - January 2015

Project Description Project Requirements are, to SWAP all
Ericsson-MOTOROLA system with HUAWEI Smart System, along with new 2G-3G Freq
Planning, Neighbour List Planning and Script running in Live Network for Legacy
& New Site added in the Telenor Network.



Responsibilities:
Main
assignment in this project involves,



ØPrepare new Site Engineering
Database based on MOTO & Ericsson Legacy data in MS-Access/Excel.



ØCreate Neighbour List for New
Site added in the Network and running the script in live network by M2000 tool.



ØCo-ordinating Weekly &
Monthly Meetings on DPR with Circle Leaders and Customer interface.



ØRe-check old Freq data and
plan new set of 2G-3G Freq for GSM-900/1800, U900, U2100 (F1/F2) with help of
U-Net Planning tool & MCOM.



ØTilt Optimization based on
Telenor Tilt Rules and KPI Monitoring during SWAP & Reforming (i.e. HO_HSR,
TCH_Congestion, CDR, TRAFFIC_Imbalance, NE_Utilization etc.



ØAlso supporting Customer
Complaints Maintenance Team to resolve the issue related to Coverage and
Quality by Radio Analysis on Aircom Asset Planning Tool.

Ø
HSPDA, 3G drive, Analysis of
drive test data, identify weak coverage/quality areas, call related issues
(CS/PS setup time, Pilot pollution, interference Ec/Io, missing neighbour, call
drops, RAB establishment issues, less throughput), rectification of the same.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.



Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Worked on Bandwidth Throttling for optimizing the extensive use of the allocated band.
Voir plus

SPRINT / AT&TJanuary 2013 - May 2014

Project Description: LTE Baseline Design over
existing CDMA & UMTS network of 800 & 1900 Band.



Responsibilities:
Main assignment
in this project involves,



Ø
mso-bidi-font-weight:bold">Co-ordination with Front-End Engineers and updating
on DPR at each weekly/monthly Team Meeting to each respective SPRINT or
AT&T Circle Representatives.



ØEngaged
with LTE Baseline Designing over existing CDMA & W-CDMA Network database
with Project updating on Mentum Planet_5.3 as per Field Team recommendations,
Re-run Simulation and stats calculation for comparison with Submitted KPI
Stats.



ØSite
Verification by co-coordinating with ALU Field Team and Site Acceptance Report
submission to the SPRINT Team after analyzing LTE Drive Logs on eDat tool.



ØPreparing
Drive Routes for LTE Data Log collection for ATP Reports which includes
Stationary Point Data Log Collection and i-RAT HO Timeout calculation on
MapInfo_11.0



Ø
Pre
& Post Cluster Launch KPI Monitoring on ALU Post Processing Tool SPO along
with weekly & daily KPI Trends Submission to the SPRINT-USA.



Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Extensive use of Dbus Monitor Logs and Serial Logs to analyze and detect the packet traversing. Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Analyzing network packet in Network Layer by using Wireshark Logs.

ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.



Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Worked on Bandwidth Throttling for optimizing the extensive use of the allocated band.

ØSide-by-side
also supporting to the AT&T LTE Design Team for off-loading the ALU FO Team
from all design related task on Atoll_7.1 as like SPRINT.



Ø

mso-fareast-language:ZH-CN;mso-bidi-language:TH">Optimization based on DT logs
and KPI (Pilot Pollution, Overshooting, Call drop, HO failure NBR missing, bad
RSCP and EcNo)

Voir plus

Orange, SwitzerlandFebruary 2011 - December 2012

Project Description 2G & 3G Network Design support along with
Capacity Site Plan, Freq Plan for both 2G & 3G Network, Site Configuration
Plan and Site Material Dispatch Plan. Also keeping track of each new site
creation cycle and claiming the PO to OCH Team.



Responsibilities:
Main
assignment in this project involves,



ØCo-ordination
with Front-End Engineers and updating the Alarms on site to respective Orange
NPE Engineers on daily Basis.

ØClaiming various
Mile-Stones by creating and producing the EWO (Engineering Work Order) &
RWO (Radio Work Order) for new sites with Validation on Map-Info_11.5 &
Google Earth with Coverage Prediction on ASSET_6.1 Planning tool and Raising
“ALARM” against non-feasible sites.

ØRaising HIGH
ALERT ALARM for sites which comes in issue while surveying on field and resolve
the matter with discussion to “Orange NPE Team and ALU GNPE Team”.

ØCreating “Drive Route” for DT Coordinators
and preparing GSM and UMTS Reports based on drive data by using Actix and
sending those reports to Orange Swiss Team for validation.

ØRecommending the Network related solutions
for both GSM & UMTS from planning end for Poor KPIs of both 2G & 3G
Reports while preparing Single Technology Stats Report, Technology Upgrade over
existing technology (i.e. GSM upgrade over UMTS or vice versa) or Second
Carrier Upgrade over existing Technology for Site Acceptance Report of Orange.

Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Analyzing network packet in Network Layer by using Wireshark Logs.Ø
SimSun;color:black;mso-fareast-language:ZH-CN">Worked on Bandwidth Throttling for optimizing the extensive use of the allocated band.

ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

Ø
Optimize clusters drive test result (RSCP, EcNo) and
KPI achievement (CSSR CS & PS, CCSR CS & PS, Call Drop for CS & PS,
SHO Success Rate, Inter-RATH Handover for CS & PS).

ØKnowledge of Neighbour Planning, Parameter Audit, Pilot
Polluter, analysis of HSDPA Throughput.

















ØOptimization of 3G
network, Report analysis, soft &
softer handover check along with Hard-Handover neighbour check (active
set, monitor set & detected set).

Voir plus

Airtel Bharti-UP East & Hyderabad and TTSL–NCR, Punjab & Haryana CircleOctober 2010 - January 2011

Project Description Project was to check and verify the limits of
created harmful Electro Magnetic Fields
nearby to the Site Location in presence of other sites located in that area as
per International
Commission for Non-Ionizing Radiation Protection (ICNIRP) guidelines.



Responsibilities:
Main
assignment in this project involves,



Ø
To
check and verify the limits of harmful Electro-Magnetic Field (EMF) Emission
near to the suspicious Site location due to addition of surrounding Site’s
Radio Freq.



Ø
Verifying at 6 points of
each direction within 10 ft circle of site, especially in main lob of the
sector at roof top and then same cross check on 6 (3 in main lob & 3 in
cross-lob) points within 20 mt. in each direction at ground level.

Voir plus

Idea, TTSL & Reliance – Pan India CircleJanuary 2010 - September 2010

Project Description: Pre-bid UMTS Network Nominal Planning
by re-mapping sharing sites and validating their feasibility on MapInfo &
Google Earth for service providers (i.e. Idea, TTSL & Reliance) for Pan
India.



Responsibilities:
Main
assignment in this project involves,



Ø
Model-Tuning
on Asset_6.2 for 3G Network based on matching criteria provided by service providers.



Ø
3G Nominal Planning by
re-mapping shared sites data provided by sub-vendors (i.e. GTL, IGL, INDUS
Towers etc.) and validating their feasibility on MapInfo_11.5 & Google
Earth.



Ø
Coverage Prediction along
with Monte-Carlo Simulation run on 50% Traffic Load Criteria and meeting the
various Planning KPIs on Asset with Final Report Submission to the Client.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

Voir plus

DataCom – Tamil Nadu & Kerala CircleJuly 2009 - December 2009

Project Description: GSM Network Nominal Planning
by re-mapping sharing sites and validating their feasibility on MapInfo &
Google Earth for DataCom (sister concern of Videocon) of Tamil Nadu &
Kerala circle.



Responsibilities:
Main
assignment in this project involves,



Ø
Model-Tuning
for 2G Network based on matching criteria provided by service provider.



Ø
2G Nominal Planning on
Asset_6.1 Planning Tool by re-mapping shared sites data provided by sub-vendors
(i.e. GTL, IGL, INDUS, RIL etc.) and validating their feasibility on
MapInfo_11.0 & Google Earth.



Ø
Planning Database
maintenance and re-validation for each nominal site based on Site Survey
Reports from Field Engineers along with new Candidate Suggestion in any issues
found on planned site.



ØReleasing Planning Version on every month with final update from Field
Survey along with KPI Stats Summery Report.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.



Ø
ZH-CN;mso-bidi-language:TH;mso-bidi-font-weight:bold;mso-bidi-font-style:italic">Resolution
of customer complaints regarding network coverage and quality within agreed
scope.

Voir plus

Airtel Bharti – GurgaonOctober 2008 - June 2009

Project Description: CW Drive Testing of Pan
India and Model Tuning of GSM Network (for 900 & 1800 Band) for all type of
clutter classes on Mentum Planet.



Responsibilities:
Main
assignment in this project involves,



Ø
Best Site Selection for
various Clutter Class (Hilly, Rural, Urban, Sub-urban, Dense, High Dense, and
Highways) from the Site Database and conducting CW Drive Test Plan accordingly.



Ø
Free Band Testing (with TEMS_8.0.3 or
Agilent E6474A Receiver) before executing CW
Drive Test in that particular area, Installing & Configuring Remote Site
(Remote RF Transmitter- BVS-Coyote) with
Omni Antenna and Configuring Receiver Fox Spectrum Analyzer/Receiver at ground level.



Ø
Model Tuning on Mentum
Planet_4.2 based on RAW CW Data collected from the field and verifying with
collected DT Data too along with final submission of K-values in report to the
Client.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

Voir plus

TTSL – South and Maharashtra CircleMarch 2008 - September 2008

Project Description: GSM Network Planning by
re-mapping sharing sites and validating their feasibility on MapInfo &
Google Earth.



Responsibilities:
Main
assignment in this project involves,



Ø
2G Nominal Planning on
Asset_6.1 Planning Tool by re-mapping shared sites data provided by sub-vendors
(i.e. GTL, IGL etc.) and validating their feasibility on MapInfo_10.5 &
Google Earth.



Ø
Releasing Final Planning
Version along with KPI Stats Summery Report.



ØInvolved in SQL Script Writing
& Execution on Real-Time Environment for Report preparation based on Script
Execution results.

Voir plus

Vodafone –Rajasthan & UP West CircleJune 2007 - February 2008

Project Description: GSM Network Optimization
based on Drive Test Data Collection from fields.



Responsibilities: Main assignment in this
project involves,



ØPre & Post
Drive Test
withTEMS_6.0
along with Report Preparation and Physical Optimization after reducing
the GSM Antenna Height
recommended
by RF Planner for Vodafone UP-West Circle.



ØWalk-Testing for
VIP & VVIP Customer’s complaints in Udaipur, Jodhpur and Chittorgarh city.



ØSite Audit &
Optimization using NEMO_4.2 for Vodafone Rajasthan Circle, recommending
suggestions based on DT Data Analysis on Nemo
Analyzer
after post processing the DT Data.



ØAttending Customer Complaints and resolving
the issues with the concern of Vodafone Sales Team in Jaipur & Udaipur
zone.



ØHardware
& Soft Parameter Change recommendations using MapInfo 8.5 along with change
in assigned the BBCH & TCH Frequency
if required.



ØAttending Customer Complaints and resolving the issues with the concern of
Vodafone Sales Team in Jaipur &
Udaipur
zone.



ØReport preparation on MS Power Point for
submitting Network Report to Client.

Mes compétences

Protocols

JSON

Other

Mac

Environment of Development

Maven

Software testing

SoapUI, Selenium 2.0 + Webdriver, REST API Testing, Postman, Cucumber, Zephyr

Machine Learning

Anaconda

Open Source solutions

Wiki

Languages

Java, Gherkin

Databases

MySQL, SQLYog, HeidiSQL

IT Infrastructure

Azure DevOps, Windows, Unix

Analysis methods and tools

Kanban, Selenium, Confluence, TestNG, Bugzilla, JIRA

Others

Bitbucket, Agile Scrum, GitHub, KanScrum, Team management, FinTech, Waterfall

Mes études et formations

Technical Trainings, Courses & Certifications - --

Bachelor of Technology - Electronics & Telecommunication Engineering - Dr. APJ Abdul Kalam Technical University2003 - 2007