Adrian P.

QA Engineer

498 dollar

Mon expérience

Voir plus

Jatic Scandinavia LtdJanuary 2018 - March 2019

SCA Östrand Paper Mill in Timrå, Sweden.
• Preparation and revision of all relevant Insulation Inspection and Test
Plans (ITP’s) and Procedures.
• Provide Project personnel with the necessary Quality training and
Follow-up on Lessons Learn activities.
• Maintain records for all inspection reports and materials used in the
scope of work.
• Maintain regular communication with Construction Management Team
• Issue monthly reports required by Headoffice.
Voir plus

TecnimontOctober 2016 - September 2017

YARA Sluiskil B.V. Urea Granulation 8 Project.
• Implementing the QMS of the organization, in accordance with Client’s
requirements and principles of ISO 9001 standard.
• Preparation and revision of all relevant Inspection and Test Plans (ITP’s)
and Procedures, with assistance from concerned departments.
• Revision of Inspection Points with the Client approval.
• Preparing and maintaining of proper Document Registers for all
documents.
• Checking availability of the current approved revision of documents at
all points of work, as well as in each Subcontractor’s office.
• Following the status of Non-Conformance Reports (NCR), notification of
concerned department’s manager of such occurrence.
• Prepare the QA/QC Weekly Minutes of Meeting (MOM).
• Plan, implement and coordinate the Preservation activities on Site with
Contractor and Subcontractor Preservation Teams.
• Provide Project personnel with the necessary Quality training and
Follow-up on Lessons Learn activities.
• Maintain regular communication with Construction Management Team
• Assistance in preparation of Project Management Review.
Voir plus

JGC Construction InternationalOctober 2015 - October 2016

JGCS Consortium – Nghi Son Refinery & Petrochemical Project, Vietnam
Acting as QA Manager for JGC Zone 1.
Plan and implement the Quality Assurance activities within the Project,
coordinate all Project quality activities implementation

• Draw up a Project Quality Plan and Project Quality Procedures which
guarantee compliance with contractual requirements and ISO
Standards
• Assess the Quality Control Plans of Subcontractors and identify any
necessary corrective measure
• Prepare & Maintain Project Audit Program
• Conduct vendor/subcontractor quality survey and audits
• Initiate and promote Corrective Actions for any failure identified with
project QMS. Review disposition plan for Corrective Actions issued by
Subcontractors
• Review, approve, issue and file Audit Reports.
• Arrange follow-up audits for corrections and corrective actions
• Monitor Close-out of Audit Non Conformities
• Maintain QA database with all the Project Corrective Action Request-
CAR, Non Conformity-NC etc.
• Issue monthly reports required by Quality manager.
• Provide Project personnel with the necessary Quality training
• Follow-up Lessons Learn activities
• Maintain regular communication with Construction Management Team
Voir plus

SaipemJune 2014 - December 2014

Plan and implement the Quality Assurance activities within the Project, coordinate all Project quality activities implementation

Main work duties:
• Provide the necessary back-up to the Quality Manager regarding contractual issues relating to Quality both during tender and project execution phase
• Plan and allocate Quality functions to individual projects
• Draw up a Quality Plan, Quality Control Plan and Project Quality Procedures which guarantee compliance with contractual requirements and ISO Standards
• Coordinate planning activities with the Planning department
• Liaise with Clients about Quality matters
• Assess the suitability of Vendors and Sub-contractors for individual projects
• Interface with organization in charge for inspection and control activities
• Perform internal and external Project Audits
• Assess the Quality Control Plans of Sub-contractors and identify any necessary corrective measure
• Provide Project personnel with the necessary Quality training
• Update internal department database with all the information (Corrective Action Request-CAR, Non Conformity-NC, etc.) coming from the project and the site and prepare annual statistic analysis
• Approve and process documents prepared by Quality Control personnel (Forms and Reports) according to Company QMS (for mechanical, E&I, painting, insulation, refractory and fireproofing works etc.)
• Monitor the adequate close-out of Non Conformities
• Initiate and promote all necessary corrective actions for any failure identified with project quality system
Voir plus

GE Oil & GasSeptember 2013 - October 2013

Oman LNG Hot Gas Path Inspection for GTG
Supervising all quality aspects of the Project.

Main work duties include:
• Analysing all documentation and availability of Site Quality Check Lists and Job Cards for the scope of work
• Tracking the Nonconformities found during the execution of the HGPI of the turbine.
• Preparation of the Handover Dossier at the end of the project .
Voir plus

D'AppoloniaJuly 2012 - January 2013

C.Engineering (D'Appolonia) is ENI Iraq Subcontractor in Computerized Maintenance Management System (CMMS) implementation for six ZFOD Degassing Stations in Iraq Zubair Oil Field.

In charge with collecting and updating the Main Equipment List Database for implementing CMMS.
Main work duties include:
• To analyse project documentation available on Technical Office and to verify technical documentation by means of surveys on the field.
• To verify technical reports received from the site surveys.
• To input data on the Computerized Maintenance Management System.
• To periodically prepare technical reports.

Achievements
Completion of Main Equipment List items collection and data input in Computerized Maintenance Management System (CMMS).
Voir plus

Tozzi Sud spaJuly 2011 - March 2012

Tozzi Kazakhstan LLP is the E&IT Subcontractor in Kashagan Development Experimental Program Project.
Responsibilities
• QA/QC Electrical and Instrumentation inspection works for Reinstatement of LERs, for MC certification.
• In charge with developing Project Quality Assurance documents, plans and procedures.
• Organize and perform QA audits on Project team and Contractor / Supplier work processes.
• Identify quality problems providing to the project team updated information.
• Recommending corrective and preventive actions.
• Revision and implementation of a project Quality Management System (QMS) that assures policies, objectives, targets and standards are met;
• Support Project Coordinators by ensuring that the QMS meets their needs;
• Work with local contractors to help them develop and implement compatible Quality Management Systems;
• Provide specialist QMS support and to raise QA awareness and ensure that value adding QA considerations are effectively addressed throughout design and project execution;
• Advise Project Coordinators and their supervisors of quality problem areas and recommended corrective actions.
• Specialist in ACS (QED-i Automated Completion System), the Project software database tool for Mechanical Completion used by Agip KCO.
• Issue of Mechanical Completion Certificates and preparation of System Completion dossier for Mechanical Completion Certification.

Achievements
Contribution to ISO 9001 compliance of the project QA/QC department (document required, organizational charts, set of standards, Quality Policy etc.)
Contribution to Mechanical Completion Certification using QED-i Automated Completion System
Voir plus

TecnimontFebruary 2008 - November 2008

Tecnimont is EPC Contractor for Q-CHEM II
Responsibilities
Coordinating Project QA/QC Discipline inspectors for Project construction works and Mechanical Completion.
• Coordination of the implementation of Mechanical Completion System and the Mechanical Completion data base.
• Promoting all the action necessary to provide the final completion subsystem/system, for subsequent handover to the downstream precommissioning works.
• Monitoring that the system/subsystem are completed according to the priority defined in the precommissioning / commissioning schedule.
• Ensure the progress updating for certification completion and punch list close out.
• Ensure the client involvement to obtain the approval of the MC of all system subsystem and subsequent hand over to commissioning.

Coordinating Mechanical Completion Team responsible for:
• Receive original punch list by discipline supervisor and record them on the punch list record database.
• Take punch list from file for responsible signature when the job on the field is completed;
• Maintain updated progress of closed punch list items;
• Address discipline supervisor / subcontractor in punch list close-out as per given priority by the Precommissioning Group;
• Monitor status of pending priority punch list in each subsystem and keep informed the Construction Management;
• Monitor discipline completion. When a discipline is completed within a Subsystem, issuing the Discipline Acceptance Certificate according to “Mechanical Completion Manual”;
• Monitor the status of Final Completion Dossier
• Monitor the Final Completion Dossier preparation by Subcontractor/ Precom-Commissioning Group respectively.

Achievements
Database development and implementation for System Mechanical Completion Certification.
Database development of Punch List Monitoring
Issuing Systems Completion Certificates for Project Scope of Work.
Voir plus

Techint GroupFebruary 2001 - May 2007

1. QA/QC Deputy Manager
Techint Cimimontubi is Mechanical & EI subcontractor for NLNG (Natural Gas Liquefaction) Projects Bonny Island.

Responsibilities
In charge with assisting QAQC Manager in establishing, implementing, documenting and controlling the Project Quality Program.
• Preparation, control and revision of all Project quality procedures necessary for the implementation of the Project Quality Plan throughout all phases of the project, in accordance with Client’s requirements and principles of the current revision of the Standard ISO 9001
• Preparation of all relevant Inspection and Test Plans (ITP’s) assisted by concerned departments.
• Preparation and updating of the “Internal Audit Plan”.
• Performing all internal and External Audits as part of the apointed Audit Team, carried out to check compliance to ISO 9001 and Project Procedures. Closing of all Audit Finding Reports (AFRs) and issuing of Corrective/Preventive Actions Requests for QAQC Manager aproval.
• Preparing and maintaining Document Registers.
• Maintaining and verifying the Index of approved and commented documents.
• Updating of “Documents Status” list when a new document revision is issued for approval and keeping track of current phase of each document.
• Maintaining of “Controlled Copy Holder” distribution list of “approved for construction” Procedures and ITPs.
• Preparation of QA/QC department Daily Minutes of Meeting (MOM).
• Assistance in preparation of Project Management Review.
• Following the status of Field Inspection Reports (FIR) and Non-Conformance Reports (NCR), notification of concerned department’s manager of such occurrence. Closing of FIR and NCR and updating the weekly status.
• Maintaining and updating “Site Personal Training” register.

Achievements
Development of Quality procedures and Method Statements
Participation in all internal and external audits with good compliance to Iso 9001 Standard requirements.
Development of Database for Welding and for Mechanical Completion.


2.QA/QC Engineer (QC Records Management)

Techint Cimimontubi is Mechanical & EI subcontractor for NLNG (Natural Gas Liquefaction) Projects Bonny Island.

Responsibilities
In charge with Management of Piping, Welding and E&I Quality Records, “Welding and NDT Summary” preparation of Pressure Test Packages, preparation of Final Dossier for the scope of work:
• Manage the “Welder Qualification Log”
• Collecting the “Daily Welding Report” and preparation of “Weekly Report of Welder performance – production welds and repair rate”. Maintaining the “Weld Repair Status” and indexing the “Weld Repair Authorization” forms.
• Developing and maintaining the Welding Database with data collected from Daily Welding Report (DWR), NDT Request forms (radiographic, magnetic, ferrite, PAMI an other tests), their result and issuing of final Welding and NDT Summary for each Isometric Drawing for pressure test-package preparation.
• Issuing of “Outstanding NDE” backlog and following-up of status for such pending activities.
• Maintaining “Welding Consumables Certificates” from approved supplier and updating status of availability.
• Maintaining “Material Traceability”, “PWHT Records”, “Piping Spool Inspection Report” records, Structural Steel reports, equipment receiving and preservation records and all other QC Forms that are used in piping welding and mechanical activities.
• Managing all electrical and mechanical Original Records to be sent to Contractor for Mechanical Completion (MC) of systems/subsystems. Maintaining index and filing the copies of such QC Forms.
• Requesting for MC (Certificate for Mechanical Completion) clearance based on closing of all construction and testing activities, system-wise.
• Final Dossier preparation and submitance to Contractor of all Quality documents indexed in part, volume and section, according to Final Dossier Handover procedure.

Achievements
Software Database developing for Welding and Mechanical Completion.
Handover of Quality Procedures and Records Final Dossiers.

Mes compétences

Testing tools, SolidWorks, Quality Assurance, Project Management, AutoCAD